TO: Honorable Mayor & Members of the North Port Commission
FROM: Peter D. Lear, CPA, CGMA, City Manager
TITLE: Drainage Easement Agreement Between MQ Coco Plum LLC and North Port Road and Drainage District for Proposed Gateway at Cocoplum Development.
Recommended Action
Approve Drainage Easement Agreement Between MQ Coco Plum LLC and North Port Road and Drainage District for Proposed Gateway at Cocoplum Development.
Background Information
Currently, in a severe storm, water in the Cocoplum Waterway overflows through a low area along the waterway's south bank, into a shallow ditch across the proposed Gateway at Cocoplum development towards the US 41 stormwater drainage swale. The proposed Gateway at Cocoplum Development is located at the northeast corner of US 41 and Salford Boulevard.
The developer, MQ Coco Plum LLC, proposes to redirect the stormwater through a new underground piped conveyance system to be installed by the developer. This will allow road and parking to be constructed over the underground piped conveyance system. Exhibit 1, Drainage Easement Agreement, is proposed to be executed between the developer and the North Port Road and Drainage District to allow continuation of the Cocoplum Waterway overflow into the new underground piped conveyance system. Exhibit A contains the proposed Drainage Easement Sketch and Description. The sufficiency of the piped conveyance system was reviewed and approved by the City's Stormwater Manager through the site development review (SDR) process under project number MAS-16-023.
Following are key points in the drainage easement:
* The Developer (Grantor) shall install, operate and maintain the new underground piped conveyance system in perpetuity.
* The City (Grantee) shall assist only if needed in emergencies or if Grantor fails to maintain/repair the system and public health and safety is at risk from a stormwater drainage backup.
* In such instances, the Grantee will be allowed access to perform t...