File #: 18-813    Version: 1 Name:
Type: Consent Agenda Status: Passed
File created: 11/9/2018 In control: City Commission Regular Meeting
On agenda: 1/8/2019 Final action: 1/8/2019
Title: Purchase two (2) replacement 4-inch Thompson Pumps for an estimated $73,546.00 and one (1) replacement 6-inch Thompson Pump for an estimated $38,573.00 from Thompson Pump Manufacturing Co., Inc. for an estimated total of $112,119.00.
Attachments: 1. Exemption Form - Thompson Pump and Manufacturing Co. Inc_, 2. Sourcewell Public Utility Equipment with Related Accessories and Supplies Contract Acceptance and Award Number 012418-TPM, 3. Thompson Pump Manufacturing Co., Inc. Sourcewell Awarded Contract and Quote for 4-inch Model 4JSCM-DIST-4LE2T-M, 4. Thompson Pump Manufacturing Co., Inc. Sourcewell Awarded Contract and Quote for 6-inch Model 6JSCEE-DIST-4LE2T-M, 5. Equipment Overview, 6. Vehicle Repair History Reports, 7. Equipment & Fleet Replacement Score Sheet, 8. PowerPoint Presentation, 9. Florida Division of Corporations Document
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
TO: Honorable Mayor & Members of the North Port Commission

FROM: Peter D. Lear, CPA, CGMA, City Manager

TITLE: Purchase two (2) replacement 4-inch Thompson Pumps for an estimated $73,546.00 and one (1) replacement 6-inch Thompson Pump for an estimated $38,573.00 from Thompson Pump Manufacturing Co., Inc. for an estimated total of $112,119.00.



Recommended Action

Approve the utilization of Sourcewell Public Utility Equipment with Related Accessories and Supplies Contract Number 012418-TPM to purchase two (2) replacement 4-inch Thompson Pumps for an estimated $73,546.00 and one (1) replacement 6-inch Thompson Pump for an estimated $38,573.00 from Thompson Pump Manufacturing Co., Inc. for an estimated total of $112,119.00.

Background Information

City Commission approved $78,940.00 in the fiscal year 2019 budget for the replacement and purchase of:

Approved Estimated
Project SLA New Equipment Old Equipment (CID) Budget Cost
U19RVH 19-6319 Two (2) 4-inch Pumps Two (2) 4-inch Pumps $78,940.00 $73,546.00
CIDs (6543 & 6544)

The purchase of two (2) replacement 4-inch Thompson Pumps model number 4JSCM-DIST-4LE2T-M for the Utilities Department to be utilized by staff during Lift Station emergencies. This pump is needed to keep wastewater from overflowing during peak times. CIDs #6543 and 6544 will be disposed of through the City's auction services.

City Commission approved $41,360.00 in the fiscal year 2019 budget for the replacement and purchase of:

Approved
Project SLA New Vehicle Old Equipment (CID) Budget Estimated Cost
U19RVH 19-6319 6-inch Pump 6-inch Pump (3446) $41,360.00 $38,573.00

The purchase of one (1) replacement 6-inch Thompson Pump model number 6JSCEE-DIST-4LE2T-M for the Utilities Department to be utilized by staff during Lift Station emergencies. This pump is needed to keep wastewater from overflowing dur...

Click here for full text