Skip to main content
File #: 20-2129    Version: 1 Name:
Type: Consent Agenda Status: Agenda Ready
File created: 3/16/2020 In control: City Commission Regular Meeting
On agenda: 5/12/2020 Final action: 5/12/2020
Title: Approve Contract 2020-38 with Zep Construction, Inc. in the Amount of $139,953.00, with a Contingency of $13,995.00, for a Total Project Cost of $153,948.00 for the Myakkahatchee Creek Water Treatment Plant (WTP) Structural Rehabilitation Project Phase 1 - Flocculation Tank No. 1 Repairs.
Attachments: 1. Contract No. 2020-38, 2. Notice of Intent to Award, 3. Award Recommendation Memo, 4. Bid Tabulation, 5. RFB Submittal by Zep Construction, Inc, 6. RFB 2020-38 with Addendum, 7. Florida Division of Corporations Document
TO: Honorable Mayor & Members of the North Port Commission

FROM: Peter D. Lear, CPA, CGMA, City Manager

TITLE: Approve Contract 2020-38 with Zep Construction, Inc. in the Amount of $139,953.00, with a Contingency of $13,995.00, for a Total Project Cost of $153,948.00 for the Myakkahatchee Creek Water Treatment Plant (WTP) Structural Rehabilitation Project Phase 1 - Flocculation Tank No. 1 Repairs.


Recommended Action

Approve Contract 2020-38 with Zep Construction, Inc. in the amount of $139,953.00, with a contingency of $13,995.00, for a total project cost of $153,948.00 for the Myakkahatchee Creek Water Treatment Plant (WTP) Structural Rehabilitation Project Phase 1 - Flocculation Tank No. 1 Repairs.

Background Information

In 2019, CDM Smith, Inc. completed the structural analysis of the Myakkahatchee Creek Water Treatment Plant. Their evaluation determined that the existing flocculation tank No. 1 structure was not structurally sound, and rehabilitation would be necessary in order for the plant to operate at normal operating capacity. The rehabilitation, as recommended by the Consultant, includes demolishing and removing the existing concrete masonry unit (CMU) baffle walls and floor slab, replacing and recompacting displaced soil, constructing a new reinforced concrete structural slab and baffle wall, removing existing coating from all interior concrete surfaces, repairing spalls, gouges and cracks, repairing eroded concrete surfaces, and coating the interior of the tank using a polyurethane coating.

Request for Bid No. 2020-38 for the Myakkahatchee Creek WTP Structural Rehabilitation Project Phase 1 - Flocculation Tank No. 1 Repairs was advertised on January 10, 2020. A non-mandatory pre-bid meeting was held on January 22, 2020 at 2:00pm and a site visit was held on January 27, 2020. Five bids were received, opened and read on February 12, 2020 at 2:00pm.

Staff reviewed the bids and the contractor has been determined to be qualified for the project by...