TO: Honorable Mayor & Members of the North Port Commission
FROM: Peter D. Lear, CPA, CGMA, City Manager
TITLE: Approve the Reimbursement Agreement for Replacement Improvements to Lift Station 88 with the West Villages Improvement District
Recommended Action
Approve the Reimbursement Agreement for Replacement Improvements to Lift Station 88 with the West Villages Improvement District.
Background Information
In 2006, West Villages Improvement District (District) designed, permitted, installed and dedicated the master lift station 88, located in Gran Paradiso, to the City. The pumps and control panels were designed to carry the flows from this station approximately 7.5 miles to the Pan American Blvd Wastewater Treatment Plant. In late November 2019, the Southwest Wastewater Reclamation Facility (SWWWRF), located within the District's boundaries, began operation and flows from Lift Station 88 were redirected to this much closer facility. Because of the reduced distance that the flows travel to SWWWRF, a reduction in pump size at Lift Station 88 is necessary to prevent short-cycling of the pumps that could lead to premature pump failure and potential sanitary sewer overflows. The existing pumps, electrical control panels, and related components at Lift Station 88 have not yet reached their useful life of approximately 20 years, therefore, the District and the City have agreed to share the costs of redesigning and replacing two pumps, control panels, and all related components for Lift Station 88.
Per the terms of the Reimbursement Agreement for Replacement Improvements to Lift Station 88, the District will redesign and replace the existing pumps and related equipment and components at the station, perform calculations related to flow, head pressures and other operations, prepare the hydraulic model and provide any other related work needed. The District will pay the actual replacement costs, including redesign and acquisition, and provide the City with the f...
Click here for full text