TO: Honorable Mayor & Members of the North Port Commission
FROM: A. Jerome Fletcher II, ICMA-CM, MPA
TITLE: Approve Work Assignment 2023-01 with Stantec Consulting Services, Inc., in the Amount of $163,041.82, for the 2023 Water Distribution Improvements & Pipeline Bridge Replacement Project
Recommended Action
Approve Work Assignment 2023-01 with Stantec Consulting Services, Inc., in the Amount of $163,041.82, for the 2023 Water Distribution Improvements & Pipeline Bridge Replacement Project.
Background Information
As part of an ongoing program to improve potable water distribution system reliability, fire flow, water quality, and pressure as well as reduce the amount of flushing necessary to maintain water quality in the focus areas, Utilities is installing new water lines to loop the remaining dead-end lines throughout the City. In this program phase, dead-end water lines on Lubec Avenue, Lundale Avenue, Okolona Street, and Portage Street will be eliminated.
Ø July 22, 2022: Request for Letters of Interest (RLI) 2023-01 for the Water Distribution System Improvements Project was issued to the eight firms under Category 2 of Continuing Contract 2020-58 to secure professional engineering services to design, bid and provide construction phase services for the project.
Ø September 2, 2022: Four (4) Letters of Interest were received and evaluated.
Ø September 13, 2022: Stantec Consulting was selected to proceed with development of a scope and fee schedule.
Also, as part of the programmed replacement of aging bridge waterlines throughout the City, the Utilities Department plans to replace the pipelines affixed to bridges along Appomattox Drive with new pipelines installed under the waterways via horizontal directional drill.
Ø July 26, 2022: Request for Letters of Interest (RLI) 2023-02 for the Water Pipeline Bridge Replacements was issued to the eight firms under Category 2 of Continuing Contract 2020-58 to secure professional engineering services to design, bid and provide construction phase services for the project.
Ø September 2, 2022: Three (3) Letters of Interest were received and evaluated.
Ø September 13, 2022: Stantec Consulting was selected to proceed with development of a scope and fee schedule.
Since Stantec was selected for both projects and they are similar in nature, so to achieve cost savings in both the design and construction, these two projects have been combined. After careful review of the scope and fee for the combined project, Utilities recommends Stantec Consulting Services, Inc. be awarded Work Assignment 2023-01 for this project, in the amount of $163,041.82.
Strategic Plan
Infrastructure & Facilities Integrity
Good Governance
Financial Impact
The amount of $163,041.82 is available in the account number below and budgeted in the respective project:
Account Number |
Project |
Available Amount |
420-6061-533.63-00 |
U21WBR |
$93,340.82 |
420-6061-533.63-00 |
U22WDI |
$69,701.00 |
Procurement
Continuing Contract No. 2020-58-12 was procured pursuant to Sec. 2-406 Professional services selection under Consultants’ Competitive Negotiation Act (CCNA), F.S. § 287.055. Work Assignment No. 2023-01 was issued under Continuing Contract No. 2020-58-12.
Attachments:
1. Work Assignment No. 2023-01 with Scope and Fee Schedule
2. RLI 2023-01 Evaluation & Ranking
3. Stantec Consulting Letter of Interest 2023-01 Submittal
4. Request for Letters of Interest 2023-01
5. RLI 2023-02 Evaluation & Ranking
6. Stantec Consulting Letter of Interest 2023-02 Submittal
7. Request for Letters of Interest 2023-02
8. Continuing Contract No. 2020-58-12
9. Florida Division of Corporations Documents
Prepared by: Nicole Brown, Utilities Business Services Coordinator
Department Director: Nancy Gallinaro, Utilities Director