File #: 24-1687    Version: 1 Name:
Type: Consent Agenda Status: Passed
File created: 12/2/2024 In control: City Commission Regular Meeting
On agenda: 3/18/2025 Final action: 3/18/2025
Title: Approve the Eleventh Amendment to Construction Manager at Risk Contract No. 2023-17.001 for Construction Services Contract Phase II With Wharton-Smith, Inc., in the Amount of $766,936.00, for Repair/Demolition Services at the Public Services Facility Site Located at 5455 Pan American Boulevard.
Attachments: 1. Amendment No. 11, 2. Contract, 3. Florida Division of Corporations Document

TO:                                           Honorable Mayor & Members of the North Port Commission

 

FROM:                      A. Jerome Fletcher II, ICMA-CM, MPA, City Manager

 

TITLE:                     Approve the Eleventh Amendment to Construction Manager at Risk Contract No. 2023-17.001 for Construction Services Contract Phase II With Wharton-Smith, Inc., in the Amount of $766,936.00, for Repair/Demolition Services at the Public Services Facility Site Located at 5455 Pan American Boulevard.

 

 

Recommended Action

 

Approve the Eleventh Amendment to Construction Manager at Risk Contract No. 2023-17.001 for Construction Services Contract Phase II with Wharton-Smith, Inc., in the amount of $766,936.00, for repair/demolition services at the Public Services Facility site located at 5455 Pan American Boulevard.

 

Background Information

 

The Public Services Facility site, consisting of multiple structures including the Parks and Recreation Maintenance Facility and the Solid Waste Recycling Station, sustained significant damage from Hurricane Ian that requires both repair and demolition services. This includes, but is not limited to:

 

Ø                     Demolition of the former Parks and Recreation Maintenance Facility.

 

Ø                     Roof repairs of the garage utilized by the Department of Utilities.

 

Ø                     Removal of damaged structures such as a Parks shed, former guard shack, Utilities storage shed, and a decommissioned generator.

 

Ø                     Replacement cover to the Solid Waste Quonset hut, and site fencing.

 

Staff continues to work with representatives from the Federal Emergency Management Agency, (FEMA), Rostan Solutions, Inc., and the City insurance provider, Halliwell, to identify funding availability for reimbursement of this project.

 

Upon evaluation of the project, the use of the Construction Manager at Risk (CMaR) Continuing Services Contract has been identified as the most expedient path to complete this project. The CMaR contracting process includes the following two phases:

 

Ø      Phase One:  The Contractor is selected and issued a Work Assignment for the Pre-Construction Phase. During this portion of the project, the contractor evaluates the work required, obtains quotes from applicable contractors, and develops the Guaranteed Maximum Price (GMP).

 

Ø      Phase Two:  The Eleventh Amendment to the CMaR Contract No. 2023-17.001 presented for approval is for the Construction Phase of the process for Work Assignment No. 2024-39FM.

 

The Department of Public Works provided a direct selection of Wharton-Smith, Inc., as the preferred CMaR to perform the repair/demolition services at the Public Services Facility site located at 5455 Pan American Boulevard.

 

Accordingly, staff requests City Commission approval of the Eleventh Amendment to CMaR Contract No. 2023-17.001 with Wharton-Smith, Inc., in the amount of $766,936.00.

 

The Eleventh Amendment to Construction Manager at Risk Contract No. 2023-17.001 has been reviewed by the Interim City Attorney and is legally correct as to form.

 

Strategic Plan

 

Infrastructure & Facilities Integrity

Safe Community

 

Financial Impact

 

Funding in the amount of $766,936.00 is available in the Fiscal Year 2025 budget in Project No. IAN22, account number 001-0760-519.46-04.

 

Procurement

 

Phase II - Repair/Demolition Services at the Public Services Facility site located at 5455 Pan American Boulevard, Construction Manager at Risk Contract No. 2023-17.001 was procured pursuant Chapter 2 Administration, Article VIII Procurement, Section 2-406 Professional services selection under Consultants’ Competitive Negotiation Act (CCNA), F.S. § 287.055 of the Code of the City of North Port, Florida.

 

Attachments

1.                     Amendment No. 11

2.                     Contract

3.                     Florida Division of Corporations Document

 

 

 

Prepared by:                                            Garrett Woods, Senior Business Manager

 

Department Director:                       Chuck Speake, Public Works Director