TO: Honorable Mayor & Members of the North Port Commission
FROM: A. Jerome Fletcher II, City Manager
TITLE: Approve Change Order No. 1 to Work Assignment 2021-04 Under Continuing Services Contract 2020-58-12 for the Sumter Boulevard Utility Extensions Project with Stantec Consulting Services, Inc. for an Additional Cost of $24,230.17, Increasing the Total Work Assignment Cost to $202,390.20
Recommended Action
Approve Change Order No. 1 to Work Assignment 2021-04 for the Sumter Boulevard Utility Extensions Project with Stantec Consulting Services, Inc. for an additional cost of $24,230.17, increasing total Work Assignment cost to $202,390.20.
Background Information
In 2015, Stantec Consulting Services, Inc. (Stantec) completed a permitting level design for a Project to extend water and wastewater service along Sumter Boulevard through the I-75 interchange and obtained the required permits, all of which had a five-year expiration. During the City Commission Budget Workshop held on July 22, 2020, the Commission directed staff to prioritize the funding of this Project for construction in Fiscal Year 2021. At the November 24, 2020, City Commission Regular Meeting, Work Assignment 2021-04 was awarded to Stantec for the following services:
§ Engineering services to conduct geotechnical investigations for the crossings under I-75.
§ Prepare permit applications for additional permits required.
§ Prepare construction plans and specifications.
§ Assist with the bidding and selection process for construction services.
§ Provide shop drawings and request for information review during construction.
§ Prepare record drawings.
§ Provide overall project oversight.
During the Florida Department of Transportation (FDOT) permitting review process, FDOT determined that the proposed open-cut installation of the water and sewer mains would not be permittable within the FDOT Limited Access Right-of-Way for I-75. In order to obtain the required permits, additional subsurface exploration and design work is needed. Change Order No. 1 includes additional geotechnical investigations, modifications to the design, updates to the constructions plans and bid documents, and additional permitting coordination with FDOT as necessary to complete this project. Therefore, the Department of Utilities recommends Commission approve Change Order No. 1 to Work Assignment 2021-04 with Stantec, for an additional $24,230.17 increasing total Work Assignment cost to $202,390.20.
Strategic Plan
Develop and promote City governance that fosters trust and utilizes departmental strengths and innovative philosophies to facilitate effective and efficient provision of all City services.
Financial Impact
Funding in the amount of $24,230.17 has been allocated in the Department of Utilities Budget in the following account number and respective Project:
|
Account Number |
Project |
Available Amount |
|
306-6064-536.63-00 |
U20WES |
$ 24,230.17 |
Procurement
Continuing Contract No. 2020-58-12 was procured pursuant to Sec. 2-406 Professional services selection under Consultants’ competitive Negotiation Act (CCNA), F.S. § 287.055. Work Assignment No. 2021-04 was issued under Continuing Contract No. 2020-58-12.
Attachments:
1. Change Order No.1 with Scope and Fee Schedule
2. Work Assignment No. 2021-04
3. Continuing Contract No. 2020-58-12 with Stantec Consulting Services, Inc.
4. Florida Division of Corporations Document
Prepared by: Nicole Brown, Utilities Business Services Coordinator