TO: Honorable Mayor & Members of the North Port Commission
FROM: A. Jerome Fletcher II, ICMA-CM, MPA, City Manager
TITLE: Approve Second Amendment to Construction Manager at Risk Contract No. 2023-17.004 for Construction Services Contract, Phase II with Jon F. Swift, Inc. in the Amount of $611,683, for Hurricane Ian Repairs at the North Port Aquatic Center.
Recommended Action
Approve Second Amendment to Construction Manager at Risk Contract No. 2023-17.004 for Construction Services Contract, Phase II with Jon F. Swift, Inc. in the amount of $611,683, for Hurricane Ian repairs at the North Port Aquatic Center.
Background Information
As a result of impacts from Hurricane Ian, the North Port Aquatic Center suffered extensive damage attributed to high winds and water intrusion. As outlined in the Halliwell Construction Services report and the Rostan Damage Assessment Report, the following infrastructure and equipment was identified as needing repair/replacement:
Ø Shade structure at the top of the slide tower
Ø Signage, roof and roof flashing
Ø Large shade structures
Ø Three parasol style shade canopies
Ø Competition pool scoreboard and base
Ø Ornamental fencing
In consultation with City Administration the use of the Construction Manager at Risk (CMaR) Continuing Services Contract has been identified as the most expedient path to complete this project. The following describes the CMaR process specific to this project:
Ø January 29, 2024: Work Assignment No. 2024-26FM was issued to Jon F. Swift, Inc. for the pre-construction phase (Phase 1). During this phase the Contractor evaluated the work required, obtained quotes from applicable contractors, and developed the Guaranteed Maximum Price (GMP).
Ø April 2, 2024: Jon F. Swift, Inc. submitted the GMP. This Amendment to Contract No. 2023-17.004 presented for approval is for the construction phase of the process. The Project Manager with the Department of Public Works provided a direct selection of Jon F. Swift, Inc. as the preferred CMaR to carry out the project at the North Port Aquatic Center and requests approval of this Amendment to proceed to construction.
The Second Amendment to Construction Manager at Risk Contract No. 2023-17.004 for Construction Services Contract, Phase II with Jon F. Swift, Inc. for Hurricane Ian repairs at the North Port Aquatic Center has been reviewed by the City Attorney and is legally correct as to form.
Strategic Plan
Infrastructure & Facilities Integrity
Financial Impact
Funding in the amount of $611,683 has been allocated in the Parks & Recreation Department Fiscal Year 2024 budget in Project No. IAN22, account number 001-3037-572-46-04.
Procurement
Contract 2023-17-004 was procured pursuant to Sec. 2-406 Professional Services selection under the Consultants Competitive Negotiation Act (CCNA), F.S. § 287.055 of the Code of the City of North Port, Florida.
Construction Manager at Risk (CMAR) Process:
Phase One - The Contractor is selected and issued a Work Assignment for the pre-construction phase. Phase Two -The Guaranteed Maximum Price (GMP) for the construction phase was negotiated for Hurricane Ian repairs at the North Port Aquatic Center.
Attachments:
1. Second Amendment to Contract No. 2023-17.004
2. Contract No. 2023-17.004
3. Work Assignment 2024-26FM
4. Florida Division of Corporations Document
Prepared by: Cheryl Greiner, Business Operations Manager
Department Director: Sandy Pfundheller, Parks & Recreation Director