Legislation Details

File #: 26-1080    Version: 1 Name:
Type: Consent Agenda Status: Agenda Ready
File created: 8/12/2026 In control: City Commission Regular Meeting
On agenda: 9/8/2026 Final action:
Title: Approve Work Assignment No. 2023-40.003 IT3-2026 - Inflow & Infiltration Rehabilitation Cured In Place Pipe (CIPP) Lining - Freemont Avenue and Lift Station #19 with Insituform Technologies, LLC for Cured in Place Pipe Lining of Areas Identified of High Flow Inflow & Infiltration Around Freemont Avenue and Lift Station 19 in the Amount of $252,684.90.
Attachments: 1. Work Assignment No. 2023-40.003 IT3-2026, 2. Assignment, Assumption, and First Amendment, 3. Contract No. 2023-40.003, 4. Request for Bid 2023-40 Award Recommendation, 5. Request for Bid 2023-40 and Addendum
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO:                                           Honorable Mayor & Members of the North Port Commission

 

FROM:                      A. Jerome Fletcher II, ICMA-CM, MPA, City Manager

 

TITLE:                     Approve Work Assignment No. 2023-40.003 IT3-2026 - Inflow & Infiltration Rehabilitation Cured In Place Pipe (CIPP) Lining - Freemont Avenue and Lift Station #19 with Insituform Technologies, LLC for Cured in Place Pipe Lining of Areas Identified of High Flow Inflow & Infiltration Around Freemont Avenue and Lift Station 19 in the Amount of $252,684.90.

 

 

Recommended Action

 

Option 1: Approve Work Assignment No. 2023-40.003 IT3-2026 - Inflow & Infiltration Rehabilitation CIPP Lining - Freemont Avenue and LS #19 with Insituform Technologies, LLC for cured in place pipe lining of areas identified of high flow Inflow & Infiltration around Freemont Avenue and Lift Station 19 in the amount of $252,684.90.

 

Additional Commission Options

 

Option 1: Approve Work Assignment No. 2023-40.003 IT3-2026 - Inflow & Infiltration Rehabilitation CIPP Lining - Freemont Avenue and LS #19 with Insituform Technologies, LLC for cured in place pipe lining of areas identified of high flow Inflow & Infiltration around Freemont Avenue and Lift Station 19 in the amount of $252,684.90.

 

                     Pros:  Proactively line gravity mains at risk of failure while ensuring compliance with the Consent Order for Inflow & Infiltration rehabilitation.

                     Cons: Commits utility funds to this project, which could be used on other projects.

 

Option 2: Deny Work Assignment No. 2023-40.003 IT3-2026 - Inflow & Infiltration Rehabilitation CIPP Lining- Freemont Avenue and LS #19 with Insituform Technologies, LLC for cured in place pipe lining of areas identified of high flow Inflow & Infiltration around Freemont Avenue and Lift Station 19 in the amount of $252,684.90.

 

                     Pros: Preserves utility funds for allocation to other utility projects.

                     Cons: Denial of the work assignment would result in non-compliance with the Consent Order and increase the risk of gravity main failure.

 

Background Information

 

Inflow and infiltration (I&I) are extraneous flows that enter the wastewater collection system and flow through to the wastewater treatment plant. The flow of this storm water and groundwater reduces the capacity of the system to handle wastewater and can lead to sanitary sewer overflows. Inflow occurs when storm water enters the sewer system through flooding of the manholes and direct connections of storm water to the wastewater collection system. Infiltration occurs when groundwater and storm water enter into wastewater collection system as a result of physical defects in the collection system such as cracked pipes, leaking manholes or deteriorated joints. Most of the I&I experienced by the City is a result of infiltration and this I&I Rehabilitation Project is designed to mitigate that infiltration.

 

The area around lift station #19 and Freemont Avenue has been identified as requiring extensive improvements to address significant I&I issues. Gravity mains that can be repaired will have CIPP performed to further prevent I&I. The information below provides a chronological order of events related to the procurement process for the contract award:

 

Ø                     June 2, 2022: Request for Bid No. 2023-40 for construction services of Inflow and Infiltration Rehabilitation was advertised.

Ø                     July 11, 2022: Seven (7) bids were received and opened.

Ø                     August 16, 2023: Award Recommendation Memo signed.

Ø                     August 17, 2023: The City issued the Notice of Intent to Award.

Ø                     November 28, 2023: Contract Numbers 2023-40.001, 2023-40.002, 2023-40.003 & 2023-40.004 were awarded.

Ø                     January 14, 2025: Assignment, Assumption, and First Amendment of Inflow and Infiltration Rehabilitation Contract No. 2023-40.003 was assigned to Insituform Technologies, LLC.

 

Work Assignment No. 2023-40.003 IT3-2026 - I&I - CIPP - Freemont Street and LS #19 was provided to the City Clerk’s office on August 12, 2026, for signatures, subject to City Commission approval.

 

Strategic Plan Pillar

 

Infrastructure & Facilities Integrity

 

Financial Impact

 

Funds are budgeted in account number 420-6063-536.63-00 under project number U26I&I.

 

Procurement

 

Contract No. 2023-40.003 was procured pursuant to Chapter 2, Article VIII, Section 2-404 of the City of North Port Procurement Code - Competitive Sealed Bids.

 

Attachments:

1.                     Work Assignment No. 2023-40.003 IT3-2026

2.                     Assignment, Assumption, and First Amendment

3.                     Contract No. 2023-40.003

4.                     Request for Bid 2023-40 Award Recommendation

5.                     Request for Bid 2023-40 and Addendum

 

 

Prepared by:                                            Michelle Tipp, Utilities Senior Business Manager

 

Department Director:                       Michael Vuolo, Acting Utilities Director