File #: 24-0748    Version: 1 Name:
Type: General Business Status: Agenda Ready
File created: 5/7/2024 In control: City Commission Regular Meeting
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Approve Second Amendment to Contract No. 2023-19 for Jeffrey Lake Sea Wall and Sidewalk Reconstruction with Thomas Marine Construction, Inc., in the Amount of $25,863.61.
Attachments: 1. Second Amendment, 2. First Amendment, 3. Original Contract, 4. Purchasing Document with Scope and Fee Schedule, 5. Florida Division of Corporations Document

TO:                                           Honorable Mayor & Members of the North Port Commission

 

FROM:                      A. Jerome Fletcher II, ICMA-CM, MPA, City Manager

 

TITLE:                     Approve Second Amendment to Contract No. 2023-19 for Jeffrey Lake Sea Wall and Sidewalk Reconstruction with Thomas Marine Construction, Inc., in the Amount of $25,863.61.

 

 

Recommended Action

 

Approve Second Amendment to Contract No. 2023-19 for Jeffrey Lake Sea Wall and Sidewalk Reconstruction with Thomas Marine Construction, Inc., in the amount of $25,863.61.

 

Background Information

 

During the Road and Drainage District Governing Body Meeting held on May 23, 2023, the City Commission approved Contract No. 2023-19, Jeffrey Lake Sea Wall & Sidewalk Reconstruction with Thomas Marine Construction, Inc. in the amount of $625,317.82 and contingency in the amount of $62,500.18 for a total amount of $687,818.00.

 

Work began on the seawall reconstruction on January 8, 2024. During sheet pile installation, a rock layer was struck, which was impenetrable to the equipment being used to install the sheet pile. On April 23, 2024, the City Commission ratified Amendment One to Contract No. 2023-19 in the amount of $198,861.23, which included the depletion of the contingency amount, to account for the additional equipment, labor, and time needed to drill through rock to install sheet piling for the reconstruction of the sea wall.

 

The sidewalk and drainage portion of the project are currently being completed, and it was realized that the plans deviated from field conditions, with the proposed sidewalk laying at a significantly higher elevation than the existing drainage swale adjacent to the sidewalk. This elevation difference would present a safety hazard for pedestrians due to the drop off from the sidewalk to the swale. This Second Amendment provides a riser for the proposed drainage structure as well as some additional modifications to the surrounding grading and drainage which eliminate this drop off hazard. The work associated with this Amendment will not require the closure of Pan American Boulevard, as it is confined to the sidewalk and the adjacent drainage swale.

 

The Second Amendment increases the value of the Contract by $25,863.61 bringing the total contract value to $850,042.66.

 

The Second Amendment to Contract No. 2023-19 for Jeffrey Lake Sea Wall and Sidewalk Reconstruction with Thomas Marine Construction, Inc. has been reviewed by the City Attorney and is legally correct as to form.

 

Strategic Plan

 

Infrastructure & Facilities Integrity

 

Financial Impact

 

Funding for Road and Drainage Infrastructure, Capital Improvement Program Project Number R20DSI, Drainage System Improvements in the amount of $25,863.61 has been allocated in the Fiscal Year 2024 Road and Drainage District Budget in account 107-5000-541.63-00.

 

Procurement

 

RFB No. 2023-19 was procured pursuant to Chapter 2 - Administration, Article VIII - Procurement Section 2-404 - Competitive Sealed Bid Process, of the Code of the City of North Port, Florida.

 

Thomas Marine Construction, Inc.

8999 High Cotton Lane

Fort Myers, FL 33905

 

 

Attachments:

1.                     Second Amendment

2.                     First Amendment

3.                     Original Contract

4.                     Purchasing Document with Scope and Fee Schedule

5.                     Florida Division of Corporations Document

 

 

 

Prepared by:                                            Anthony Friedman, P.E., PTOE, Transportation Engineer

 