Legislation Details

File #: CECASE-24-4117    Version: 1 Name:
Type: 1st Hearing Case Status: Passed
File created: 1/17/2025 In control: Code Enforcement Hearing
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Louis Cerbone:PASHCHUK VLADIMIR;:5302 Bayberry St North Port, FL 342866345:4.5.3 (D) ULDC, Land Clearing Debris. (1). No land clearing debris shall be allowed to be placed or stored within 25-feet of the front, side, and rear property lines of the site under the following conditions: a. The debris is piled together in one (1) single mass in only one (1) location on the site. b. The pile of debris shall not exceed 6-feet in height. c. The pile of debris shall be completely enclosed on all four (4) sides by a solid, non-opaque 6-foot high fence and shall include a gate for Fire Department access. d. No burning of debris shall occur unless a valid permit has been secured from State, County and/or local jurisdictions where appropriate. (2). For all land clearing debris that won’t be stored on the site under the conditions set forth above, said debris shall be removed completely from the site within 30-days of having been cleared. (3). Trees that are felled in the process of land cleari...
Attachments: 1. #24-4117 CERTIFIED RETURN MAIL 958901052700422907366.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.